Initial situation
In Bad Langensalza, the new combined heat and power plant, located in a former grain silo, is now being used to much greater capacity. Up to now, it has supplied the South residential area with district heating. Recently, the 1.2 MW ewers station’s low return temperatures have enabled the CHP unit to additionally supply the Hufeland Klinikum and the surrounding connected houses with district heating. Due to the higher utilization, the overall economic efficiency is higher.
The Hufeland Klinikum in Bad Langensalza is designed for around 8,000 patients and is one of the medium-sized hospitals in Germany. The Hufeland Klinikum is an academic teaching hospital with around 1,300 qualified employees.
The ewers solution
Total power of the station
Power: 1.2 MW
Nominal diameter: DN125 / DN150
Pressure rating: PN16 / PN6
Temperatures:
Primary 95 / 65 °C
Secondary 90 / 62 °C
Technical drawing of the station
Hydraulic diagram
The ewers station for district heating transfer